a square parking lot of 250m on a side. the surface of the lot is planar, sloping to one of its edges. along the downstream edge is a gutter, this gutter drains the entire lot and is sloped from both ends toward a sewer inlet at its center. the time of concentration of the lot is estimated to be 20 min, of which 18 min accounts for overland over the lot surface and 2 min accounts for travel down each half of the gutter.assuming the rational formula is applicable with a runoff coeeficient of 0.75 which of the following storms will yield the highest peak runoff? what will be the peak runoff rate in each case? a)100mm/h for a duration of 10min b) 25mm/h for a duration of 40min c)15mm/h for a duration of 66.7 min
BLOG
You are here: Home / BLOG / Uncategorized / a square parking lot of 250m on a side. the surface of the lot is planar,...
DISCLAIMER
We are a professional writing service that provides original papers. Our products include academic papers of varying complexity and other personalized services, along with research materials for assistance purposes only. All the materials from our website should be used with proper references.